Well, if you have been following my twitter. You already know most of this because you have been getting the play by play as everything has unfolded. It turns out, I might be one hellova an optimist. Seriously, there is no other explanation. Well, that and I have no sense of space, time, numbers or physical properties. It's almost been painful...twitter does allow for the play by play. I'm going to use the GoPro cameras to record this weekend's project. Should be amusing.
So, this is my wee house. I bought it with grand plans to fix it up and sell it. I haven't done all that much, but I'm about to get really busy.
A few weeks ago, I noticed a wet spot on the ceiling in the TV room. Hmmm I thought. I need to get that fixed. So I called a roofer, and I called the insurance company. Turns out, I'm getting a new roof. Whoop. They should help my plans to sell soon. I figured it was time to start the remodeling in general...esp if I might be able to use their trashcan for my trash too!! So I measured and went to Home Depot and chose my tile etc. to final do the kitchen and TV room floors.
I originally was buying the backer board and tile etc for both the tv room and the kitchen. Then I thought, maybe I should just do one room at a time. I called my friend Daisy and asked if she could help me get it all home...she has a minicooper too by the way. She said sure.
So there we are at home depot trying to get all the stuff home and both mini coopers are riding low. I mean really, really low. A home depot guy looks at our cars and says no. "Please let me get our truck and deliver it." We were going to but the guy was gone. "I can find a guy, " he said. Please see below. I don't know how I thought that was all going to fit. There is no way. Look at all of that stuff!!
So, they take it to my house. My garage is now quite full of tiling supplies.
Yesterday, I started the work of pulling up the laminate. I can get it all done in one day I said. Then I can tile in a day, and then grout in a day. I started pulling up the laminate. Hmmm. Harder than I remembered.
Several hours into, I managed to pull up the two layers of laminate, although there was still the backing left behind.. I was using a scraper, a mallet, a very sharp instrument whose name I don't know. It was slow tedious and painful work. There was a lot of cursing.
By the end of the DAY I had a 3 ft by 3 ft square cleaned and looking good. My hands and back were permenantly curled, and my entire body hurt... but I had a square done... This is going to take more than a day. It was a good looking square, but wow it took a lot to get there.
So, I have revised my schedule. Assuming I can manage to go home each evening and work on a 3x3 area... I'm hoping I can pick up speed and maybe get more done on weekends.
So, now I figure it will take me two weeks to get the the laminate flooring up. Can't imagine how long it will take to lay the tile...I'm now guessing more than a day. Damn.